&lt;p&gt;Meeting Date:&amp;nbsp; October 27, 2011&lt;/p&gt;&#13;
&lt;p&gt;Meeting Place:&amp;nbsp; MUC University Club Room&lt;/p&gt;&#13;
&lt;p&gt;Meeting Called to Order:&amp;nbsp; 9:40AM&lt;/p&gt;&#13;
&lt;p&gt;Meeting Adjourned:&amp;nbsp; 11:10AM&lt;/p&gt;&#13;
&lt;p&gt;&lt;br /&gt;&lt;/p&gt;&#13;
&lt;p&gt;FM Customer Service Rep Lynda Pavia welcomed everyone to the meeting.&lt;/p&gt;&#13;
&lt;p&gt;Lynda explained that since furniture was being received in Peck Hall, and their conference room was not being scheduled, the meeting was being held in the MUC.&amp;nbsp; Lynda announced that a Merit Award has been won from the Professional Grounds Management Society by the SIUe Grounds Department.&amp;nbsp; Copies of the presentation were shared with the Coordinators.&lt;/p&gt;&#13;
&lt;p&gt;Discussion followed regarding the installation of the new drinking fountains which allow for filling of water bottles.&amp;nbsp; Bob shared the statistics of the decision to purchase them and everyone was in agreement they are a welcome addition, especially in the Vadalabene Center and Student Fitness Center.&amp;nbsp;&lt;/p&gt;&#13;
&lt;p&gt;The campus re-lamp project was also discussed; every four years FM replaces every fluorescent bulb on campus.&amp;nbsp; Work takes place on the third shift to provide easy access and minimize disruption.&amp;nbsp; The project is currently complete in Alumni Hall and electricians are working in Founders Hall.&amp;nbsp; FM sends email notices to campus as the work is completed and to notify the University community where work begins next.&lt;/p&gt;&#13;
&lt;p&gt;Shiwand Thomas from Art &amp;amp; Design was introduced as the newest Building Coordinator; she will work with Gene Schoeneweis.&amp;nbsp; Discussion followed regarding the many retirements that may take place this year due to changes in the formula that determines benefits.&amp;nbsp; Lynda asked that coordinators considering retirement let FM know and recommend someone to take their place.&amp;nbsp; New coordinators will be needed in the new spaces being added to Art &amp;amp; Design, the Vadalabene Center and the Engineering Building as well; coordinators were asked that they recommend coordinators from the people moving into these new spaces if they knew them.&amp;nbsp; Since the current coordinators do such a good job, FM would like to see that continue.&lt;/p&gt;&#13;
&lt;p&gt;Facilities Management is facing quite a few staffing changes; Rick Klein and Mohammad Rouf are retiring in December; Bob will be leaving in the spring.&amp;nbsp; The new director will be starting in December and training with Bob until the end of March.&amp;nbsp; Also, Leasa Ferry who works in the office has accepted a new position on campus and will be sorely missed, as will all of them.&amp;nbsp; FM wishes them the best.&lt;/p&gt;&#13;
&lt;p&gt;&lt;br /&gt;&lt;/p&gt;&#13;
&lt;p&gt;Bob Washburn then shared the following:&lt;/p&gt;&#13;
&lt;ul type="square"&gt;&#13;
    &lt;li&gt;When departments are filling out drivers&amp;rsquo; permits for employees, they are reminded to use the new &amp;ldquo;800&amp;rdquo; numbers and NOT social security numbers.&lt;/li&gt;&#13;
    &lt;li&gt;Though the new Science Building (to be called &amp;ldquo;Science Lab Building West&amp;rdquo;) is scheduled to be complete in March, 2012, scheduling has been cancelled for fall classes since construction will not be complete.&amp;nbsp; Bob shared the drawings of the new building which show a bridge from the old to the new on the first floor.&amp;nbsp;&lt;/li&gt;&#13;
    &lt;li&gt;Art &amp;amp; Design West, as the addition is to be called, is on schedule to be complete in the fall of 2012.&amp;nbsp; It has begun and will continue through the winter of 2012-13 and into the spring and summer breaks of 2013.&amp;nbsp; Bob also shared exciting drawings of this addition.&lt;/li&gt;&#13;
    &lt;li&gt;The &amp;ldquo;Charles and Mary Lucas Annex&amp;rdquo; to the Vadalabene Center will house Athletics on the first floor.&amp;nbsp; The second floor remains unclaimed, though it probably won&amp;rsquo;t be for long.&amp;nbsp; The attractive project (Bob shared another drawing) is to be complete in the fall of 2012 and entirely paid for with donated funds.&lt;/li&gt;&#13;
    &lt;li&gt;A new Multi-Discipline Lab on the campus of the SIUe Alton Dental School is currently under design and scheduled to be bid next summer.&lt;/li&gt;&#13;
    &lt;li&gt;The addition to the Engineering Building will house offices and classrooms; 100% documents are being reviewed.&amp;nbsp; It is scheduled for completion in early 2013.&amp;nbsp; Bob also shared the artist&amp;rsquo;s rendering of this addition.&lt;/li&gt;&#13;
    &lt;li&gt;A Softball Practice Facility is being constructed to be completed in late December.&lt;/li&gt;&#13;
    &lt;li&gt;Peck Hall has new windows, new vestibules, and all furniture in the building is being replaced.&amp;nbsp; The new glass in the windows has already cut the effect of the sunshine in some offices by 75%.&amp;nbsp;&lt;/li&gt;&#13;
    &lt;li&gt;In Rendleman Hall, new windows will be installed and new vestibules constructed and for the first time, the lobby will become usable space.&amp;nbsp; The project is to be complete in the fall of 2012.&lt;/li&gt;&#13;
    &lt;li&gt;Dunham Hall windows will be replaced in spring/summer of 2012; it is a CDB project.&amp;nbsp; The huge sheets of glass in the original construction are no longer available, so sheets that can be connected in a seamless way are being sought.&lt;/li&gt;&#13;
    &lt;li&gt;The University is in the planning stages of a new Health Sciences Facility since many students going into other areas of health service (besides nursing) have to look elsewhere for their education, causing SIUe to lose students.&amp;nbsp; This new building will address the problem.&lt;/li&gt;&#13;
    &lt;li&gt;Retro Commissioning has begun in Rendleman and Peck Hall; engineering firms examine the buildings and report problems for the 21st Century Building Program.&amp;nbsp; As a result of their findings, certain problems were identified that moved Rendleman Hall much higher on the list of buildings to be repaired/renewed.&lt;/li&gt;&#13;
    &lt;li&gt;21st Century Building Program was proposed by Bob Washburn to bring campus buildings up to date by addressing all problems such as HVAC, electric, plumbing, etc.&amp;nbsp; It is to begin after completion of the Science Building addition when the available space in the old Science Building can be occupied by people when their building is undergoing renovation.&amp;nbsp; Its cost will be $6 million per year and all systems within a building will be addressed; HVAC, electric, painting, etc; all will be brought up to code.&amp;nbsp; As a result, Founders Hall will become the home of the Nursing Program; Alumni Hall will become the School of Education Building.&amp;nbsp;&lt;/li&gt;&#13;
    &lt;li&gt;Within the hairpin, a new area will be constructed, approximately 100&amp;rsquo; X 75&amp;rsquo;, to honor anyone who has worked at SIUe for more than 15 years.&amp;nbsp; It will be titled &amp;ldquo;Builders of the University,&amp;rdquo; and Rick Klein is working on it.&amp;nbsp; It is to be completed before the Chancellor&amp;rsquo;s retirement in July, 2012.&lt;/li&gt;&#13;
    &lt;li&gt;Changes to North University Drive are under design and IDOT is planning changes to the Delyte Morris Trail.&lt;/li&gt;&#13;
    &lt;li&gt;In East St. Louis, one million dollars has been donated for construction of a new STEM Classroom; Mike Grandy is the coordinator on the project.&lt;/li&gt;&#13;
&lt;/ul&gt;&#13;
&lt;br /&gt;&lt;br /&gt;&#13;
&lt;table bgcolor="#808080" border="0" width="100%" cellpadding="0" cellspacing="0" align="center"&gt;&#13;
    &lt;tr&gt;&#13;
        &lt;td&gt;&#13;
            &lt;p align="right"&gt;&lt;span style="color:white"&gt;URL:&lt;a href="http://www.siue.edu/facilities/customerservice/building_coordinator_meeting_minutes.shtml"&gt;http://www.siue.edu/facilities/customerservice/building_coordinator_meeting_minutes.shtml&lt;/a&gt;&lt;br /&gt; &lt;span style="color:white"&gt;&lt;strong&gt;Published by&lt;/strong&gt;: Facilities Management&lt;br /&gt; &lt;span style="color:white"&gt;&lt;strong&gt;Last Update&lt;/strong&gt;: 31 December, 2011&lt;br /&gt; &lt;span style="color:white"&gt;&lt;strong&gt;Send Comments to&lt;/strong&gt;: &lt;a href="mailto:fmserv@siue.edu"&gt;fmserv@siue.edu&lt;/a&gt;&lt;/span&gt;&lt;/span&gt;&lt;/span&gt;&lt;/span&gt;&lt;/p&gt;&#13;
        &lt;/td&gt;&#13;
    &lt;/tr&gt;&#13;
&lt;/table&gt;&#13;
&lt;p&gt;&lt;br /&gt;&lt;/p&gt;&#13;